Skip to main content
Company News

California Facility Installs CMC PEMS

By August 30, 2010July 25th, 2019No Comments

FOR IMMEDIATE RELEASE: August 30th, 2010

[California Facility Installs CMC PEMS] [Hartford, California, 9/30/2010]-

A single boiler facility installed a PEMS for compliance with 40 CFR Part 60 on one boiler at their facility in Hartford, California.  The PEMS was initially certified in July 2008 under PS-16. The boiler is operated in accordance with permit no. C-366-3-7 issued by the San Joaquin Valley Air Pollution Control District. The exhaust gas is discharged to the atmosphere through a 41 inch diameter stack. Emissions are monitored using a statistical hybrid predictive emissions monitoring system (PEMS). The PEMS installed is a SmartCEMTM-60 analyzer provided by CMC Solutions, LLC., and model training data was collected with a certified continuous emission monitoring system (CEMS). Data used in the model was collected in June and July 2007. The SmartCEM®-60 PEMS was installed in in July 2007.